国产一区二区三区不卡在线观看_国产成人手机高清在线观看网站_久久精品www人人做人人爽_毛片亚洲av无码精品国产午夜_国产在线视频一区二区三区

400-6388-667Food/Pharmaceutical/Cosmetic/Mechanical domain experts

homeother product details

Stainless steel gas stove pot large cooker wok gas food mixing pot

Release date:[2017-03-11]     Click rate:

main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.


overview
parameter

Gas sandwich pot with a large heating area, high thermal efficiency, heating evenly, material boiling time is short, easy to control the heating temperature and so on.


main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.

skills:

1, remove the heater, put the gas fire cover.

2, open the valve and intake interface.

3, counterclockwise to open the valve, open fire lit. (With a fire stove please ignite the fire).

4, while adjusting the throttle and valve switch, until the required flame.

5, stop working, close the angle valve and valve.

Precautions:

1, regularly check the sealing of the joints.

2, regularly check the stove, forbidden dirt to plug the stove plug.

3, when the first tilt when the steam, after the speed control switch.

maintenance:

1, into the steam pipe and outlet pipe leakage, elected tight nuts do not solve the problem, you should add or replace the filler.

2, the pressure gauge and safety valve should be regularly checked, if the failure of timely replacement and repair.

3, the gear box to start using after 50 hours, should be removed to let go of lubricants, rinse with kerosene or diesel, add 30 # - 40 # clean oil, use 150 hours after the second oil change, after the specific circumstances , Each used to 1000 hours or so oil change once.

4, anti-rust oil peeling, should be timely brushing, painted outside the pot of paint, it is recommended to use X55-3 aluminum powder water resistant paint.

5, the pot used after 5 years, the proposed safety of water pressure test, after the interval of water pressure test, according to the requirements of technical departments around. Water pressure test pressure P water according to the following circumstances: When the rated working pressure P <0.6MPa, P water = 0.15MPa; when the rated working pressure P = 0.6-0.8MPa, P water = P + 0.3MPa

6, the pot outside the pot body using 4.0 ~ 5.5 mm thick steel plate manufacturing, steel A3, when the outer pot after years of corrosion reduced to 2mm below, should stop using. 7, the pot of stainless steel welding and other stainless steel welding joints, should be used stainless steel electrode 102, Austrian 107, Austria 132, Austria 137, should not use other grades.

Use Note:

1, should use liquefied petroleum gas, pipeline gas, natural gas and other fuels, prohibited the use of oil;

2, connected to the stove hose and the furnace end and the valve end to be tightened, and should be naturally under the stove surface sagging, and maintain the distance of 10 cm or more, so as not to be fire scorched, resulting in an accident;

3, do not install the gas heating sandwich pot in the room, and then use the coal stove, liquefied petroleum gas or other stoves;

4, gas heating around the sandwich pan do not stack flammable items;

5, with the gas field must ensure that spacious and well ventilated;

6, gas heating sandwich pan when the ignition gas to be someone to take care of;

7, people go to turn off;

8, found that leakage or abnormalities to quickly close the valve to open the doors and windows ventilation;

9, before the break to check the gas valve and the front of the switch is closed.

Installation procedures:

1, tighten the bracket of the two set screws, shake the pot body, both ends of the inlet pipe and outlet pipe is not allowed to rotate with the pot.

2, the installation is completed, the mixing-type sandwich pot, should be empty test run test, until the transmission parts of the normal operation before they can be put into use.

3, after the air, such as joints at the leak, you can tighten the nut until the leak so far.


Contact us

Learn more about our detailed information, please contact
400-6388-667

Or leave a message to us

国产av无码国产av毛片| 亚洲国产精品久久艾草| 男人放进女人阳道动态图| 色偷偷偷在线视频播放| 中文国产成人精品久久不卡| 青青草视频免费观看| 国产aⅴ无码专区亚洲av| 亚洲av久久久噜噜噜熟女软件| 男人av无码天堂| 欧洲熟妇精品视频| 亚洲av永久综合在线观看另类| 人妻被按摩师玩弄到潮喷| 亚洲性色av一区二区三区| 国产精品天天在线午夜更新| 婷婷色婷婷深深爱播五月| 少妇高潮惨叫久久久久久电影| 亚洲日韩乱码中文无码蜜桃臀| 日韩一区二区三免费高清| 岛国aaaa级午夜福利片| 免费无码国产欧美久久18| 性高湖久久久久久久久aaaaa| 亚洲国产一区二区三区在线观看| 精品亚洲一区二区三区在线观看| 色欲人妻综合aaaaaaaa网| 无码人妻一区二区三区免费n鬼沢| 国产手机在线αⅴ片无码观看| 国产超a级动作大片中文字幕| 久久精品亚洲精品无码金尊| 丁香五月激情综合国产| 日本亚洲色大成网站www久久| 无码人妻少妇久久中文字幕| 精品久久无码中文字幕| 精品视频一区二区三区在线观看| 久久久久88色偷偷| 国产精品成人久久久久久久| 无码一区二区| 久久婷婷五月国产色综合| 国产人妻精品午夜福利免费| 亚洲av熟妇高潮30p| 熟女人妇 成熟妇女系列视频| 日日躁夜夜躁狠狠久久av|