国产一区二区三区不卡在线观看_国产成人手机高清在线观看网站_久久精品www人人做人人爽_毛片亚洲av无码精品国产午夜_国产在线视频一区二区三区

400-6388-667Food/Pharmaceutical/Cosmetic/Mechanical domain experts

homeother product details

Stainless steel gas stove pot large cooker wok gas food mixing pot

Release date:[2017-03-11]     Click rate:

main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.


overview
parameter

Gas sandwich pot with a large heating area, high thermal efficiency, heating evenly, material boiling time is short, easy to control the heating temperature and so on.


main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.

skills:

1, remove the heater, put the gas fire cover.

2, open the valve and intake interface.

3, counterclockwise to open the valve, open fire lit. (With a fire stove please ignite the fire).

4, while adjusting the throttle and valve switch, until the required flame.

5, stop working, close the angle valve and valve.

Precautions:

1, regularly check the sealing of the joints.

2, regularly check the stove, forbidden dirt to plug the stove plug.

3, when the first tilt when the steam, after the speed control switch.

maintenance:

1, into the steam pipe and outlet pipe leakage, elected tight nuts do not solve the problem, you should add or replace the filler.

2, the pressure gauge and safety valve should be regularly checked, if the failure of timely replacement and repair.

3, the gear box to start using after 50 hours, should be removed to let go of lubricants, rinse with kerosene or diesel, add 30 # - 40 # clean oil, use 150 hours after the second oil change, after the specific circumstances , Each used to 1000 hours or so oil change once.

4, anti-rust oil peeling, should be timely brushing, painted outside the pot of paint, it is recommended to use X55-3 aluminum powder water resistant paint.

5, the pot used after 5 years, the proposed safety of water pressure test, after the interval of water pressure test, according to the requirements of technical departments around. Water pressure test pressure P water according to the following circumstances: When the rated working pressure P <0.6MPa, P water = 0.15MPa; when the rated working pressure P = 0.6-0.8MPa, P water = P + 0.3MPa

6, the pot outside the pot body using 4.0 ~ 5.5 mm thick steel plate manufacturing, steel A3, when the outer pot after years of corrosion reduced to 2mm below, should stop using. 7, the pot of stainless steel welding and other stainless steel welding joints, should be used stainless steel electrode 102, Austrian 107, Austria 132, Austria 137, should not use other grades.

Use Note:

1, should use liquefied petroleum gas, pipeline gas, natural gas and other fuels, prohibited the use of oil;

2, connected to the stove hose and the furnace end and the valve end to be tightened, and should be naturally under the stove surface sagging, and maintain the distance of 10 cm or more, so as not to be fire scorched, resulting in an accident;

3, do not install the gas heating sandwich pot in the room, and then use the coal stove, liquefied petroleum gas or other stoves;

4, gas heating around the sandwich pan do not stack flammable items;

5, with the gas field must ensure that spacious and well ventilated;

6, gas heating sandwich pan when the ignition gas to be someone to take care of;

7, people go to turn off;

8, found that leakage or abnormalities to quickly close the valve to open the doors and windows ventilation;

9, before the break to check the gas valve and the front of the switch is closed.

Installation procedures:

1, tighten the bracket of the two set screws, shake the pot body, both ends of the inlet pipe and outlet pipe is not allowed to rotate with the pot.

2, the installation is completed, the mixing-type sandwich pot, should be empty test run test, until the transmission parts of the normal operation before they can be put into use.

3, after the air, such as joints at the leak, you can tighten the nut until the leak so far.


Contact us

Learn more about our detailed information, please contact
400-6388-667

Or leave a message to us

久久精品人人爽人人爽| 亚洲国产精品热久久| 亚洲中文字幕在线第六区| 国产精品久久毛片av大全日韩| 国产亚洲精品久久久久久久| 文中字幕一区二区三区视频播放| 免费国产黄网站在线观看| 日韩精品人妻系列无码专区免费| 亚洲av无码av制服丝袜在线| 精品久久久久久成人av| 国产精品综合色区在线观看| 少妇被躁爽到高潮无码久久| 亚洲午夜久久久影院| 无码av中文字幕久久专区| 中文字幕人妻伦伦| 亚洲看片lutube在线观看| 国产欧美精品区一区二区三区| 精品国产va久久久久久久冰| 无码av中文一区二区三区| 亚洲va中文字幕不卡无码| 巨茎中出肉欲人妻在线视频| 国产又黄又硬又粗| 国产成人a在线观看视频免费| 久久久久无码专区亚洲av| 亚洲精品无码不卡在线播放| 美女裸体自慰在线观看| 亚洲一区二区三区日本久久九| 五月丁香六月激情综合在线视频| 亚欧免费无码aⅴ在线观看| 国产精品爱久久久久久久| 亚洲综合欧美色五月俺也去| 99久久婷婷国产综合精品电影| 美女极度色诱视频国产| 国产av无码专区亚洲av手机麻豆| 欧美最猛黑人xxxxx猛交| 无套内射在线无码播放| 精品麻豆剧传媒av国产| 国产精品人成在线播放新网站| 精品人妻系列无码人妻漫画| 无码人妻久久一区二区三区免费丨| a级国产乱理伦片在线观看|